Compare the scope before the price. Keep this worksheet locally; no information is submitted. Prepared October 14, 2026.
| Scope / term | Quote A | Quote B |
|---|---|---|
| Provider name and quote date | ||
| Assessment charge / credit toward work | ||
| Exact charger model and supplier | ||
| Hardwired or specified receptacle | ||
| Configured charging current / output | ||
| Vehicle AC charging limit | ||
| Shared or managed charging plan | ||
| Circuit route and run allowance | ||
| Mounting / cable storage / pedestal | ||
| Electrical changes and rationale | ||
| Load-control equipment and setup | ||
| Exterior / trenching scope | ||
| Restoration responsibility | ||
| Permit authority |
Record the same scope for each provider. An allowance is not a fixed price; an incentive is not confirmed until the responsible program approves it.
| Scope / term | Quote A | Quote B |
|---|---|---|
| Who obtains and pays for permits | ||
| Inspection responsibility | ||
| Commissioning and functional check | ||
| Equipment warranty process | ||
| Workmanship warranty / terms | ||
| Exclusions and unknown conditions | ||
| How added work is authorized | ||
| Total before incentives / tax / fees | ||
| Confirmed incentive, listed separately | ||
| Deposit and balance due | ||
| Quote expiration | ||
| Expected schedule and dependencies |
Is any assessment charge due before a quote? Why is additional electrical work needed? Who handles inspection and restoration? How will I approve extra work? What company performs the job?